The real day 3 was rained out. On the next day, the mover men returned to put the roof up and temporarily tack the tin sheets on. They put them on properly after the house has been lowered down on to the permanent stumps because there is usually a bit of movement in that process.
Just after the roof was finished it poured rain. Here is a picture of the finished for now product taken the next morning.
The house is very high at the moment as there needs to be room underneath for the stumpers to get their hole digger things in. We would like the house to end up nearly a metre lower than it is in this picture. The stumpers are due to come in the next week or so.